The library was given a new permanent home in January 2018 after several years of moving to and from temporary premises (spare classrooms and then housed in the old Dental Clinic which is now the new PTA room) post Library fire.
The school had a partial rebuild post earthquake and the old but refurbished Room 1 was allocated for the Library
The lovely guys from Hydstore arrived with the shelving, the space was full of boxed books and they did an amazing job working around them.
The Junior fiction shelving being installed
So many brackets to fix on the walls. This was to be our non fiction area.
Almost 10,000 boxed books waiting to be shelved.
First the brackets
Then the shelves
Looking amazing the guys worked so fast
Loving the blue wall
And we were soon able to shelve the books